City Action on Wastewater
In order for the City to be able to complete the projects shown
in Table 9.2, the City would need to raise monthly user rates
to the $33.00 to $36.00 range. Furthermore,
the City would need to raise monthly
rates on an annual basis to reflect inflationary
changes (approximately 3%
annually) so that the City will continue to be able to adequately
fund the wastewater department.
In addition to raising user rates, it is recommended that the City
raise their current connection fee from $500 to $1,500 and increase
this rate 3% per year to keep up with inflationary changes.
Connection fees should be placed in a capital improvements fund to
be used for future
improvement projects.
Keller Analysis (ongoing)
Waste Water Citizen’s Advisory Council
Tuesday, October 07, 2008 at 11:35 AM
Contract with Keller – Engineering for Emergency Repair to Main
Sewer Line
on Highway 93 North
Ultraviolet system cost $101,900.00; sewer line needs fixed;
Wastewater in the Salmon Comprehensive
Plan
Draft City Plan 2010
CITY ANNOUNCES PROPOSED RATE CHANGE
Tuesday, December 08, 2009 at 11:55 AM
DEQ
says ok as is, apparently
EPA Notice of Violation
Response Oct 2008
Response Nov 2008
Query 10/07 thru 12/09 Violations
Notice of Continued Violations Jan 25, 2010
Data 2000 to 2009
pdf
ID0020001 - City of Salmon, 2008 NPDES Compliance Inspection [1]
Land and Water Facilitators
Upper Salmon Basin
Watershed Project
works with Lemhi Soil and Water Conservation District
Lemhi
Regional Land Trust
Messages About Wastewater
Messages about the public
meeting
CITY
INITIATIVE AND REFERENDUM
Media by Cal on Trying to
Communicate With Our City Council on January 6, 2010
EPA Data on Permit No.: ID-002000-1
Staff and Phone Listing for EPA Region 10
Water Discharge Permits (PCS)
Water Discharge Permits (PCS) Salmon
(Water Program) at EPA
User: Dottie Bayo Date: 12-16-2004 13:10:52
Comment by Alan Stanford 12/9/04
Flow to population still very high due to very high I/I.
User: Nancy Bowser Date: 09-13-2001 11:21:11
The flow to population ratio is not within the 50-150 gpcd
because the collection system for the City of Salmon is old and
has extremely high I/I. The treatment facility was oversized to
accommodate the excessive I/I.
Idaho Water Reuse
Sawtooth Fish Hatchery:
Sawtooth Cleaning Waste Ponds
58.01.17 - RULES FOR THE RECLAMATION AND REUSE OF MUNICIPAL AND
INDUSTRIAL WASTEWATER
IDAPA 58 TITLE 01 CHAPTER 16
58.01.16 - WASTEWATER RULES
Rules for Administration of Wastewater Treatment Facility Grants
Convert
Arco MUNICIPAL WASTEWATER REUSE PERMIT
Final Wastewater Reuse Permits in Idaho
Consulting Engineers
UUB
MWH
Murray, Smith &
Associates, Inc.
Carollo
HDR
Morrison-Maierle
Helena, MT
406-442-3050
Wright Water Engineers
Denver, CO
303-480-1700
Century West Engineering
Bend, OR
800-929-5444
Spokane, WA
509-838-3810
American Engineering Corp.
Redmond, WA 98052
HKM Engineering
Billing, MT
406-656-6399
Butte, MT
406-723-8213
Winzler & Kelly Consulting Engineers
Eureka, CA
707-443-8326